{"id":12183,"date":"2022-02-11T10:53:53","date_gmt":"2022-02-11T09:53:53","guid":{"rendered":"https:\/\/www.rijeka.hr\/en\/?page_id=12183"},"modified":"2026-03-17T10:52:43","modified_gmt":"2026-03-17T09:52:43","slug":"renewal-heating-system-city-rijeka","status":"publish","type":"page","link":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/","title":{"rendered":"Renewal of the heating system of the City of Rijeka"},"content":{"rendered":"<h2><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"377\" class=\"aligncenter wp-image-12190 size-full\" src=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Europski-fond-za-regionalni-razvoj-1000x377.jpg\" alt=\"\" srcset=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Europski-fond-za-regionalni-razvoj-1000x377.jpg 1000w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Europski-fond-za-regionalni-razvoj-1000x377-600x226.jpg 600w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Europski-fond-za-regionalni-razvoj-1000x377-768x290.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/p>\n<h2>Project Title<\/h2>\n<p>Renewal of heating system in the City of Rijeka (KK.04.2.3.04)<\/p>\n<h2>Project Goal<\/h2>\n<p>The project is aimed at increasing the energy efficiency of the heating system and the reliability of heat supply in the city of Rijeka by investing in the modernisation of production plants (heating plants) and the distribution network with a gradual transition to energy efficient district heating.<\/p>\n<h2>Duration<\/h2>\n<p>1 March 2021 \u2013 31 August 2023 (at the latest until 31 Dec. 2023)<\/p>\n<h2>Competent authority<\/h2>\n<p>Ministry of Regional Development and EU Funds as the Management Body<\/p>\n<h2>Key project activities:<\/h2>\n<ul>\n<li>Renewal of the existing heat distribution network, i.e. reconstruction of 7.9 km of the existing heat distribution network.<\/li>\n<li>Construction of a new connecting heat distribution network, i.e. construction of 2.5 km of a new heat distribution network, which would connect 3 heating systems in the eastern part of the city into a single system (Gornja Ve\u017eica, Vojak and Donja Ve\u017eica) and 3 heating systems in the western part of the city (Malonji, Zamet, Krnjevo) also into a unique system. The Srdo\u010di system will remain, due to the distance, a separate heating system.<\/li>\n<li>Reconstruction of 4 existing production heat plants, which includes the reconstruction of the heating plants Gornja Ve\u017eica, Malonji and Srdo\u010di where it is planned to install cogeneration plants for simultaneous production of heat and electricity and solar collectors for the production of heat from renewable sources. In the Zamet heating plant, it is planned to replace the existing medium fuel oil boilers with a modern condensing gas boiler room. In addition, complete automation of the mentioned heating plants is planned so that they can be remotely controlled and managed. Also, in order to optimise heat production and reduce costs in heating plants where cogeneration units will be installed, heat storage tanks will be installed. They allow constant operation of cogeneration units during the day in order to produce energy in the optimal mode.<\/li>\n<\/ul>\n<div id='gallery-1' class='gallery galleryid-12183 gallery-columns-3 gallery-size-thumbnail'><dl class='gallery-item'>\n            <dt class='gallery-icon landscape'>\n                <a href='https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Postoje\u0107e-stanje-250x250.jpg' title=\"\" data-rl_title=\"\" class=\"rl-gallery-link\" data-rl_caption=\"\" data-rel=\"lightbox-gallery-1\"><img loading=\"lazy\" decoding=\"async\" width=\"250\" height=\"250\" src=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Postoje\u0107e-stanje-250x250.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-12186\" srcset=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Postoje\u0107e-stanje-250x250.jpg 250w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Postoje\u0107e-stanje-250x250-200x200.jpg 200w\" sizes=\"(max-width: 250px) 100vw, 250px\" \/><\/a>\n            <\/dt>\n                <dd class='wp-caption-text gallery-caption size-thumbnail' id='gallery-1-12186'>\n                Existing situation\n                <\/dd><\/dl><dl class='gallery-item'>\n            <dt class='gallery-icon landscape'>\n                <a href='https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Planirano-stanje-toplinarstva-Grada-Rijeke-250x250.jpg' title=\"\" data-rl_title=\"\" class=\"rl-gallery-link\" data-rl_caption=\"\" data-rel=\"lightbox-gallery-1\"><img loading=\"lazy\" decoding=\"async\" width=\"250\" height=\"250\" src=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Planirano-stanje-toplinarstva-Grada-Rijeke-250x250.jpg\" class=\"attachment-thumbnail size-thumbnail\" alt=\"\" aria-describedby=\"gallery-1-12187\" srcset=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Planirano-stanje-toplinarstva-Grada-Rijeke-250x250.jpg 250w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/02\/Planirano-stanje-toplinarstva-Grada-Rijeke-250x250-200x200.jpg 200w\" sizes=\"(max-width: 250px) 100vw, 250px\" \/><\/a>\n            <\/dt>\n                <dd class='wp-caption-text gallery-caption size-thumbnail' id='gallery-1-12187'>\n                Planned situation \n                <\/dd><\/dl>\n            <br style='clear: both' \/>\n        <\/div>\n\n<p><strong>Project results<\/strong>:<\/p>\n<ul>\n<li>Significant reduction of CO2 emissions in the amount of 18%, and removal of SO2 from production.<\/li>\n<li>Improving efficiency to optimize production and reduce distribution losses.<\/li>\n<li>In total, almost 95% of the heat distribution network will be renewed, with 26% or 3.8 km already renewed with the existing EBRD loan in the period 2015-2018, 16% of the new network was built as part of the University Campus project, while 53% or 7.9 km will be renewed by this project. The remaining 5% or 0.9 km of the network is in good condition without major losses and is scheduled for reconstruction in the next medium term. Finally, after reconstruction and optimisation with the construction of additional 2.5 km of connecting heating pipelines, the planned length of the heat distribution network will be OVERALL 17.4 km<\/li>\n<li>Switching all heating plants to natural gas as the main energy source while retaining fuel oil as a reserve in exceptional cases if needed (in case of problems with gas supply, overhauls, etc.). The project will enable the production of more than 50% of thermal energy from high-efficiency cogeneration and renewable energy sources according to the most rigorous applicable standards as laid down in EU directives for the systems covered by the renewal.<\/li>\n<li>Complete renovation of the system without increasing costs for users or burdening the City budget.<\/li>\n<li>Preparing the system for increasing integration of renewable energy sources in the future, all in accordance with the EU &#8220;green plan&#8221;.<\/li>\n<li>24-hour operation of all heating plants in the system.<\/li>\n<\/ul>\n<h2>Project promotor<\/h2>\n<ul>\n<li>Energo d.o.o.<\/li>\n<\/ul>\n<h2>Budget<\/h2>\n<ul>\n<li>Total project value: HRK 112,270,986.39<\/li>\n<li>Overall eligible \u00a0project costs: HRK 106,924,107.46<\/li>\n<li>Amount of EU co-financing\/grant: HRK 83,893,707.80 (78,46%)<\/li>\n<\/ul>\n<h2>Financed under<\/h2>\n<p><u><a href=\"https:\/\/strukturnifondovi.hr\/\">Structural Funds<\/a><\/u>\u00a0\u2013 European Regional Development Fund \u2013\u00a0<u><a href=\"https:\/\/strukturnifondovi.hr\/eu-fondovi\/esi-fondovi-2014-2020\/op-konkurentnost-i-kohezija\/\">Operational programme \u201cCompetitiveness and Cohesion 2014 \u2013 2020\u201d<\/a><\/u>, through the Integrated territorial investment mechanism (ITI mechanism) within the Rijeka Urban Agglomeration.<\/p>\n<h2>Official website of the project<\/h2>\n<p><a href=\"https:\/\/energotoplinarstvo.com\/\">https:\/\/energotoplinarstvo.com\/<\/a><\/p>\n<h2>Contact for further information<\/h2>\n<p>Energo d.o.o.<br \/>\nDolac 14, 51000 Rijeka<br \/>\ne-mail:\u00a0<u><a href=\"&#109;a&#x69;l&#x74;o&#x3a;i&#x6e;f&#x6f;&#64;&#x65;&#110;&#x65;&#114;&#x67;&#111;&#x2e;&#104;&#x72;\">&#105;&#x6e;&#102;&#x6f;&#64;&#101;&#x6e;&#101;&#x72;g&#x6f;&#46;&#104;&#x72;<\/a><\/u><br \/>\ntel.:\u00a0<u><a href=\"tel:+38551353006\">+385 (0)51\/353-006<\/a><\/u><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Title Renewal of heating system in the City of Rijeka (KK.04.2.3.04) Project Goal The project is aimed at increasing the energy efficiency of the heating system and the reliability of heat supply in the city of Rijeka by investing in the modernisation of production plants (heating plants) and the distribution network with a gradual&#8230;<\/p>\n","protected":false},"author":8,"featured_media":13458,"parent":1318,"menu_order":69,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_trash_the_other_posts":false,"footnotes":"","_links_to":"","_links_to_target":""},"tags":[],"class_list":["post-12183","page","type-page","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Renewal of the heating system of the City of Rijeka - City of Rijeka<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Renewal of the heating system of the City of Rijeka - City of Rijeka\" \/>\n<meta property=\"og:description\" content=\"Project Title Renewal of heating system in the City of Rijeka (KK.04.2.3.04) Project Goal The project is aimed at increasing the energy efficiency of the heating system and the reliability of heat supply in the city of Rijeka by investing in the modernisation of production plants (heating plants) and the distribution network with a gradual...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Rijeka\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-17T09:52:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/\",\"url\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/\",\"name\":\"Renewal of the heating system of the City of Rijeka - City of Rijeka\",\"isPartOf\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg\",\"datePublished\":\"2022-02-11T09:53:53+00:00\",\"dateModified\":\"2026-03-17T09:52:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#primaryimage\",\"url\":\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg\",\"contentUrl\":\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg\",\"width\":800,\"height\":533,\"caption\":\"Renewal of heating system\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Po\u010detna stranica\",\"item\":\"https:\/\/www.rijeka.hr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"City administration\",\"item\":\"https:\/\/www.rijeka.hr\/en\/city-government\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"EU projects\",\"item\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"Closed projects\",\"item\":\"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Renewal of the heating system of the City of Rijeka\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/#website\",\"url\":\"https:\/\/www.rijeka.hr\/en\/\",\"name\":\"City of Rijeka\",\"description\":\"City of Rijeka web Portal\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rijeka.hr\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Renewal of the heating system of the City of Rijeka - City of Rijeka","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/","og_locale":"en_US","og_type":"article","og_title":"Renewal of the heating system of the City of Rijeka - City of Rijeka","og_description":"Project Title Renewal of heating system in the City of Rijeka (KK.04.2.3.04) Project Goal The project is aimed at increasing the energy efficiency of the heating system and the reliability of heat supply in the city of Rijeka by investing in the modernisation of production plants (heating plants) and the distribution network with a gradual...","og_url":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/","og_site_name":"City of Rijeka","article_modified_time":"2026-03-17T09:52:43+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/","url":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/","name":"Renewal of the heating system of the City of Rijeka - City of Rijeka","isPartOf":{"@id":"https:\/\/www.rijeka.hr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#primaryimage"},"image":{"@id":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg","datePublished":"2022-02-11T09:53:53+00:00","dateModified":"2026-03-17T09:52:43+00:00","breadcrumb":{"@id":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#primaryimage","url":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg","contentUrl":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2022\/12\/Renewal-of-heating-system.jpg","width":800,"height":533,"caption":"Renewal of heating system"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/renewal-heating-system-city-rijeka\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Po\u010detna stranica","item":"https:\/\/www.rijeka.hr\/en\/"},{"@type":"ListItem","position":2,"name":"City administration","item":"https:\/\/www.rijeka.hr\/en\/city-government\/"},{"@type":"ListItem","position":3,"name":"EU projects","item":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/"},{"@type":"ListItem","position":4,"name":"Closed projects","item":"https:\/\/www.rijeka.hr\/en\/city-government\/eu-projects\/closed-projects\/"},{"@type":"ListItem","position":5,"name":"Renewal of the heating system of the City of Rijeka"}]},{"@type":"WebSite","@id":"https:\/\/www.rijeka.hr\/en\/#website","url":"https:\/\/www.rijeka.hr\/en\/","name":"City of Rijeka","description":"City of Rijeka web Portal","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rijeka.hr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/pages\/12183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/comments?post=12183"}],"version-history":[{"count":3,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/pages\/12183\/revisions"}],"predecessor-version":[{"id":12932,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/pages\/12183\/revisions\/12932"}],"up":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/pages\/1318"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/media\/13458"}],"wp:attachment":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/media?parent=12183"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/tags?post=12183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}