{"id":11828,"date":"2021-12-01T12:35:15","date_gmt":"2021-12-01T11:35:15","guid":{"rendered":"https:\/\/www.rijeka.hr\/en\/?p=11828"},"modified":"2021-12-02T12:39:22","modified_gmt":"2021-12-02T11:39:22","slug":"works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced","status":"publish","type":"post","link":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/","title":{"rendered":"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced"},"content":{"rendered":"<p>The beginning of works within the project &#8220;Improvement of water and utility infrastructure in the Rijeka Agglomeration&#8221; co-financed by the European Union under the Cohesion Fund, one of the largest investments in water and utility infrastructure in Croatia was announced in the Rijeka City Hall.<\/p>\n<p>The project envisages the construction of a new wastewater treatment plant on Delta, of a high second stage of purification, and the construction and reconstruction of about 217 kilometers of sewerage and 125 pumping stations. In addition, works will be carried out on about 100 kilometers of public water supply in two cities &#8211; Rijeka and Kastav and three municipalities &#8211; Vi\u0161kovo, \u010cavle and Jelenje, which form the territory of the Rijeka Agglomeration.<\/p>\n<div id=\"attachment_11833\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"478\" class=\"wp-image-11833 size-medium\" src=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-na-podru\u010dju-aglomeracije-Rijeka-2-600x478.jpg\" alt=\"\" srcset=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-na-podru\u010dju-aglomeracije-Rijeka-2-600x478.jpg 600w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-na-podru\u010dju-aglomeracije-Rijeka-2-768x612.jpg 768w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-na-podru\u010dju-aglomeracije-Rijeka-2-502x400.jpg 502w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-na-podru\u010dju-aglomeracije-Rijeka-2-753x600.jpg 753w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-na-podru\u010dju-aglomeracije-Rijeka-2.jpg 964w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><p class=\"wp-caption-text\">ANDREJ MAROCHINI, MARKO FILIPOVI\u0106 AND VALENTIN DUJMOVI\u0106<\/p><\/div>\n<p>The first group of works will begin in December in the western part of Rijeka and they relate to the construction of transport collectors and the optimisation of the existing system, and the deadline for completion is 36 months. The value of the agreement for construction works is about HRK 215 million. The construction of 13.1 km of transport pipelines is envisaged that will drain wastewater from the agglomeration territory to the wastewater treatment plant on Delta and optimise the existing system by building a plant that will drain retentions and rain overflows. In addition to the construction of the drainage system, the reconstruction of 6.9 km of public water supply will be carried out.<\/p>\n<p>The second group of works relates to the enlargement of Vi\u0161kovo, and the deadline for completion is more than 65 months. The value of the agreement for construction works is about HRK 182 million.<\/p>\n<p>&#8220;After thorough preparations, tenders and signed contracts with contractors, extensive works are underway within a large utility project for which we have been granted HRK 1.2 billion by the EU. This is, so to speak, a generation project that will ensure that in this area and in the decades to come we have clean and healthy drinking water and clean sea of the highest quality. Also, this is one of the largest projects in the Republic of Croatia concerning water agglomerations, both in terms of invested funds and the complexity of its implementation. Owing to this project, kilometres of the water supply and sewerage networks will be renewed and additionally built, and a new wastewater treatment plant will be built,&#8221; said Mayor Marko Filipovi\u0107.<\/p>\n<p>A contractor has been selected for the design and construction of a wastewater treatment plant in the Rijeka agglomeration, and the value of the selected offer is around HRK 523 million. The predicted deadline for the construction of the plant is 48 months.<\/p>\n<h2>Project financing<\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-11835 alignright\" src=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Jedno-od-najve\u0107ih-ulaganja-u-vodno-komunalnu-infrastrukturu-u-RH-600x406-600x406.jpg\" alt=\"\" width=\"600\" height=\"406\" srcset=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Jedno-od-najve\u0107ih-ulaganja-u-vodno-komunalnu-infrastrukturu-u-RH-600x406.jpg 600w, https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Jedno-od-najve\u0107ih-ulaganja-u-vodno-komunalnu-infrastrukturu-u-RH-600x406-591x400.jpg 591w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/>The value of the project \u201cImprovement of water and utility infrastructure in the territory of the Rijeka agglomeration\u201d amounts to HRK 1,761,563,462.00 (excluding VAT) and is co-financed by the European Union up to the amount of HRK 1,256,548,480.00 (excluding VAT), which makes 71.33% of the costs. The EU funds are provided under the Operational Programme &#8220;Competitiveness and Cohesion&#8221; for the period 2014-2020.<\/p>\n<p>The remaining part of the project value in the amount of HRK 505,014,982.00, or 28.67%, will be provided from national funds for co-financing project costs. The Republic of Croatia, through the Ministry of Environmental Protection and Energy and the national entity for water management \u201cHrvatske vode\u201d, provide the same amount of funds, HRK 185,164,000.00 each. The remaining HRK 134,687,000.00 of national funds will be provided by the utility company\u201d Vodovod i kanalizacija\u201d from a long-term financial loan.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first group of works within the project &#8220;Improvement of water and utility infrastructure in the Rijeka Agglomeration&#8221; have commenced in the western part of Rijeka. The deadline for completion is 36 months. The value of the agreement for construction works is around HRK 215 million.<\/p>\n","protected":false},"author":89,"featured_media":11832,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_trash_the_other_posts":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[149],"tags":[381,382,380],"class_list":["post-11828","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article","tag-rijeka-agglomeration","tag-wastewater-treatment-plant","tag-water-and-utility-infrastructure"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced - City of Rijeka<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced - City of Rijeka\" \/>\n<meta property=\"og:description\" content=\"The first group of works within the project &quot;Improvement of water and utility infrastructure in the Rijeka Agglomeration&quot; have commenced in the western part of Rijeka. The deadline for completion is 36 months. The value of the agreement for construction works is around HRK 215 million.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/\" \/>\n<meta property=\"og:site_name\" content=\"City of Rijeka\" \/>\n<meta property=\"article:published_time\" content=\"2021-12-01T11:35:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-02T11:39:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"807\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"mbembic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"mbembic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/\",\"url\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/\",\"name\":\"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced - City of Rijeka\",\"isPartOf\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg\",\"datePublished\":\"2021-12-01T11:35:15+00:00\",\"dateModified\":\"2021-12-02T11:39:22+00:00\",\"author\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/#\/schema\/person\/c6f2fe4ba52af1df0e9a2b0a22d63cc0\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#primaryimage\",\"url\":\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg\",\"contentUrl\":\"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg\",\"width\":807,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Po\u010detna stranica\",\"item\":\"https:\/\/www.rijeka.hr\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/#website\",\"url\":\"https:\/\/www.rijeka.hr\/en\/\",\"name\":\"City of Rijeka\",\"description\":\"City of Rijeka web Portal\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.rijeka.hr\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/#\/schema\/person\/c6f2fe4ba52af1df0e9a2b0a22d63cc0\",\"name\":\"mbembic\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.rijeka.hr\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3ce3ce6ed89053defb3e592d3a5f1f9f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3ce3ce6ed89053defb3e592d3a5f1f9f?s=96&d=mm&r=g\",\"caption\":\"mbembic\"},\"sameAs\":[\"https:\/\/www.rijeka.hr\/\"],\"url\":\"https:\/\/www.rijeka.hr\/en\/author\/mbembic\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced - City of Rijeka","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/","og_locale":"en_US","og_type":"article","og_title":"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced - City of Rijeka","og_description":"The first group of works within the project \"Improvement of water and utility infrastructure in the Rijeka Agglomeration\" have commenced in the western part of Rijeka. The deadline for completion is 36 months. The value of the agreement for construction works is around HRK 215 million.","og_url":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/","og_site_name":"City of Rijeka","article_published_time":"2021-12-01T11:35:15+00:00","article_modified_time":"2021-12-02T11:39:22+00:00","og_image":[{"width":807,"height":600,"url":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg","type":"image\/jpeg"}],"author":"mbembic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"mbembic","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/","url":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/","name":"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced - City of Rijeka","isPartOf":{"@id":"https:\/\/www.rijeka.hr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#primaryimage"},"image":{"@id":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg","datePublished":"2021-12-01T11:35:15+00:00","dateModified":"2021-12-02T11:39:22+00:00","author":{"@id":"https:\/\/www.rijeka.hr\/en\/#\/schema\/person\/c6f2fe4ba52af1df0e9a2b0a22d63cc0"},"breadcrumb":{"@id":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#primaryimage","url":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg","contentUrl":"https:\/\/www.rijeka.hr\/en\/wp-content\/uploads\/sites\/2\/2021\/12\/Najavljen-po\u010detak-radova-na-pobolj\u0161anju-vodno-komunalne-infrastrukture-.jpg","width":807,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/www.rijeka.hr\/en\/works-aimed-improving-water-utility-infrastructure-territory-rijeka-agglomeration-commenced\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Po\u010detna stranica","item":"https:\/\/www.rijeka.hr\/en\/"},{"@type":"ListItem","position":2,"name":"Works aimed at improving water and utility infrastructure in the territory of the Rijeka Agglomeration have commenced"}]},{"@type":"WebSite","@id":"https:\/\/www.rijeka.hr\/en\/#website","url":"https:\/\/www.rijeka.hr\/en\/","name":"City of Rijeka","description":"City of Rijeka web Portal","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rijeka.hr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.rijeka.hr\/en\/#\/schema\/person\/c6f2fe4ba52af1df0e9a2b0a22d63cc0","name":"mbembic","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rijeka.hr\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3ce3ce6ed89053defb3e592d3a5f1f9f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3ce3ce6ed89053defb3e592d3a5f1f9f?s=96&d=mm&r=g","caption":"mbembic"},"sameAs":["https:\/\/www.rijeka.hr\/"],"url":"https:\/\/www.rijeka.hr\/en\/author\/mbembic\/"}]}},"_links":{"self":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/posts\/11828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/users\/89"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/comments?post=11828"}],"version-history":[{"count":3,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/posts\/11828\/revisions"}],"predecessor-version":[{"id":11837,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/posts\/11828\/revisions\/11837"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/media\/11832"}],"wp:attachment":[{"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/media?parent=11828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/categories?post=11828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rijeka.hr\/en\/wp-json\/wp\/v2\/tags?post=11828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}